Protection Setting Studies
These should be carried out on new power systems such as a new industrial installation, but also done for modifications to existing power systems. Judgement needs to be applied in such cases to determine what parts of a full study are needed. The full protection study comprises:
- Establish system data
- Fault level calculation as necessary
- Liaison with interested parties
- Produce setting schedule
- Prepare drawings and co-ordination graphs
- Preparation of narrative on settings and recommendations
- Preparation of full report, a controlled document